JAPANESE SERVICE TEAM PERFECTLY PREPARED

01.12.2014

Last weekend, the new Japanese service team that will be in charge of the two Multi Tasker 800 N and the associated motor car in the future, has completed its ten week training in Leipzig. Since mid-September, the three crane operators had been trained in the operation, maintenance and repair of the vehicles. The Multi Tasker 800 N together with the motor car carrying the counterweight will be used for track construction in the greater Tokyo area. During transportation, the two vehicles – the railway crane and the motor car – will communicate with each other so that the crane can be operated from the crane cabin as from the motor car cabin. This is of course a special challenge to the operators who are perfectly prepared thanks to the intense training.